St Paul's School

Earlier this year we spent some time at St Paul’s Primary School and installed a 25kW solar system on their administration office. When organising the details of their install it was important to ensure any additional electrical work that needed to be completed could be done at the same time so ensure minimal disruption to the classroom.

After a review with the team at Hembrows, the school decided to air condition the Prep block, as they currently have no classrooms with air conditioning. The tuckshop also had a new air conditioner and commercial oven installed while we were there!

Both the Solar and AC installations were completed over the school holidays, which meant everything was ready to go when the new term started. St Paul’s now has access to cheaper electricity bills and two Prep classrooms are now cooled and ready for the Queensland summer.

If you would like to know more about this project or discuss your own commercial requirements please email bdm@hembrows.com.au or phone (07) 3290 4899.

Project Overview

  • Client: St Paul’s Primary School Woodridge

  • Scope:

    • Installation of a 25kW Solar PV System which includes 77 x 330W Phono Panels and a 20kW SMA inverter

    • Installation of 2 x 14kW Samsung Ducted Air Conditioning Units with 4-way in-ceiling cassettes.

  • Resources: This project utilised staff from our Commercial and Solar teams

  • Duration: Project was completed in 2 weeks over the school holiday period in April 2019

  • Key Staff:
    Development Manager – Craig Smith
    Construction Manager – Joe Di Salvo and Neil Robinson
    Solar System Design - Chris Green

EPSG3857_Date20190718_Lat-27.635162_Lon153.110400_Mpp0.075.jpg
Admin