Laser Central Darra

Our largest rooftop solar project to date, this project took over 6 months in planning and revision including several meetings with key stakeholders including the client (Denmac Nominees), tenant (Laser Central), builder (Hutchinson Builders) and structural engineer (McVeigh).

The installation was tricky in that the layout had to be altered due to a lightweight roof design whereby only half of the original panels were installed in the central part of the main warehouse roof.

The sole occupier of the building, Laser Central, receives all of the benefit of the system and will go on to use almost all of the power as their laser steel fabrication business expands threefold from their previous building.

Congratulations to all involved!

Project Overview:

  • Client: Denmac Nominees and Laser Central

  • Scope: 815.04kW rooftop solar system including:

    • 2,146 x Canadian Solar panels (mix of 360W and 400W)

    • 8 x 82.8kW plus 1 x 25kW Solar Edge inverters

    • 1,074 x DC optimisers

    • Clenergy Racking system

    • 400kVAr ABB PFC unit with 3-Phase controller

  • Resources: 15 Hembrows staff full time for two months while installing panels. As well technical staff from SolarEdge and HTC for commissioning of the inverters and PFC unit respectively

  • Duration: 3 Months

  • Key Staff:

    Development Manager - Craig Smith

    Project Manager - Joe Di Salvo

    Technical and Design - Chris Green